SRP Undergrounding Keim District - 44th Street to Hogahn Drive

SRP Undergrounding Keim District - 44th Street to Hogahn Drive

This 14 lot undergrounding district includes the conversion of overhead power lines and phone lines. The existing lines are in rough terrain and are hard to maintain for the utility providers. The proposed plan includes relocating the lines into the right-of-way in front of the homes in the area. Design is almost complete and public outreach has begun. Assuming the necessary contributions are met, construction should begin in late 2017.